ENGINEERING INSTALLATION PROTOCOL

Installation
Guide.

Step-by-step installation procedures for Sentorise LiFePO4 batteries. Follow these guidelines to ensure safe, compliant, and validated system integration.

⚠️ CRITICAL SAFETY NOTICE

  • Disconnect all power sources before beginning installation
  • Wear safety glasses and insulated gloves when handling batteries
  • Never short-circuit terminals - can cause fire or explosion
  • Do not install in enclosed spaces without proper ventilation
  • Read all documentation before proceeding with installation

Required Tools & Materials

🔧 Tools

  • Socket wrench set (10mm, 13mm)
  • Torque wrench (5-20 Nm range)
  • Wire strippers and crimpers
  • Multimeter (voltage testing)
  • Cable cutters

📦 Materials

  • Battery cables (appropriate gauge)
  • Ring terminals (M8 or M10)
  • Heat shrink tubing
  • Cable ties and mounts
  • Anti-corrosion spray

🛡️ Safety Equipment

  • Safety glasses
  • Insulated gloves
  • Fire extinguisher (Class C)
  • First aid kit
  • Ventilation fan (if needed)

Installation Steps

1

Pre-Installation Inspection

Before installation, verify battery condition and prepare the installation area.

  • Inspect battery packaging for damage during shipping
  • Verify battery voltage (should be 13.0-13.4V for 12V models)
  • Check serial number matches order documentation
  • Measure installation space to confirm fitment
2

Disconnect Existing System

Safely disconnect and remove old battery (if replacing).

⚠️ CRITICAL: Always disconnect NEGATIVE (-) terminal first, then POSITIVE (+) terminal. This prevents short circuits.

  • Turn off all electrical loads and disconnect shore power/solar
  • Disconnect negative (-) cable from old battery
  • Disconnect positive (+) cable from old battery
  • Remove hold-down brackets and lift out old battery
3

Prepare Installation Area

Clean and prepare the battery compartment for new installation.

  • Clean battery tray - remove corrosion, dirt, and debris
  • Inspect hold-down brackets for damage or wear
  • Check ventilation - ensure adequate airflow (minimum 50mm clearance)
  • Verify cable routing - plan cable paths to avoid pinch points
4

Position Sentorise Battery

Carefully place the battery in the compartment with correct orientation.

💡 TIP: LiFePO4 batteries are lighter than lead-acid. Use caution when lifting to avoid sudden movements.

  • Verify terminal orientation - positive (+) and negative (-) must match cable positions
  • Lower battery into tray - avoid dropping or impact
  • Center battery in compartment - ensure even clearance on all sides
  • Install hold-down brackets - torque to manufacturer specifications (typically 10-15 Nm)
5

Connect Cables

Connect battery cables in the correct sequence to prevent short circuits.

⚠️ CONNECTION ORDER: Connect POSITIVE (+) terminal first, then NEGATIVE (-) terminal. Reverse of disconnection order.

  • Inspect cable terminals - ensure clean, corrosion-free connections
  • Connect positive (+) cable to positive terminal - hand-tighten first
  • Connect negative (-) cable to negative terminal - hand-tighten first
  • Torque terminals to 10-12 Nm (do not over-tighten)
  • Apply anti-corrosion spray to terminals
6

System Verification

Test the installation before putting the system into service.

  • Measure battery voltage - should read 13.0-13.4V (12V models)
  • Check for loose connections - gently tug on cables
  • Turn on one small load (e.g., LED light) to verify operation
  • Monitor for 15 minutes - check for unusual heat or odors
  • Document installation date and serial number for warranty

Post-Installation Checklist

  • Register warranty at sentorise.com/warranty
  • Configure battery monitor for LiFePO4 chemistry (if applicable)
  • Set charger profile to LiFePO4 mode (14.2-14.6V bulk, no float)
  • Label battery with installation date and specifications
  • Keep documentation in accessible location

Need Installation Support?